Case studies library
Engineering at the edge of portability.
A "super-sized Climax tool allowed the builder of two massive gantry dock cranes to complete a daunting machining task with surprising ease and speed.
Learn more 
15 feet of steel plate in 6 hours
A Climax portable milling machine reduced the time to cut steel plate from two weeks to less than a single shift.
Learn more 
Repairing micro-fissures inside the reactor pressure vessel
A revolutionary, remote-operated tool extended a nuclear plant's life by making repairs in accessible reaches of the reactor core.
Learn more 
Saving days of dismantling
How a Climax maintenance solution allowed a producer of high-quality papers to increase plant production without adding additional machines.
Learn more 
One tool for several tasks
For a customer installing a steam turbine's new rotor and steam nozzle, Climax built a tool that performed three key tasks with a single setup.
Learn more 
Reward for an early finish
A standard Climax boring machine with a special mounting apparatus helped a bridge repair contractor earn a $280,000 bonus.
Learn more 
Training trims downtime
A Caterpillar dealer cut its maintenance downtime in half with a Climax train-the-trainer program.
Learn more 
Mining the advantages of multitasking
A mining services company relies on Climax boring machines and AutoBoreWelders for their versatility, reliability, ability to work in close quarters and do two jobs at once.
Learn more 
Reducing outages from MSIV leakage
A Climax custom machine has helped revolutionize the setup, safety and quality of main steam isolation valve repairs throughout the world.
Learn more 
Re-boring bushings at Hoover Dam
To re-bore the wicket gate bushings at Hoover Dam, we addressed some extra twists that complicate the process.
Learn more 
From 3,000 hours to 8
By modifying a standard Climax valve grinding machine, we helped a shipyard dramatically cut the time to grind weld build-up from submarine valve seats.
Learn more 
6x faster missile tube re-boring
Until Climax came aboard, re-boring one submarine missile tube could take three shifts working around the clock for ten days.
Learn more 
Training the trainers at Northrop Grumman
Climax helped reverse the attrition of machining skills with intensive train-the-trainer program.
Learn more 
For China, Climax boring machines are SOP in power upgrades
Climax provided a large boring machine to retrofit turbine housings. The diameter of the internal supports was increased to allow the use of larger motors and lathes.
Learn more 